WHAT'S NEW
Water Treatment
Our regular water board customer required a large MCC for fresh water pumping. This design included automated level control of multiple tanks with high kW VSDs powered by a 2000 AMP busbar system.
Automated mains failure was handled by a very large switchover contactor and generator control. This panel was finished in record time as an urgent deadline of 60 days had to be met.